Working as Construction Manager for this fast-track, industrial, design/build pumping facility project, our team worked closely with the owner, design team and the MEP contractors throughout the design phase to ensure quality, cost control, and that decisions were in line with meeting the critical schedule. This huge project included securing a 37-acre location, extensive site work, seven new buildings, six of which were pre-engineered metal buildings, several laboratories, numerous parking lots, landscaping, and both procurement and petroleum based equipment installation.
“A. Martini & Co. lead an efficient collaborative effort with Stantec Architecture, EADs Group, and us. Their professionalism, ability to exceed deadlines and meet budgets, as well as their overall talent as a Construction Manager / General Contractor proved to be a great asset to this project. We couldn’t be more pleased with the work of A. Martini & Co.”
Mark Seale, Director of Real Estate, US